Leading Edge Homes Inc. – It’s Time To Think About Hurricane Preparedness

The Dog Days Of Summer Means –

HURRICANE SEASON IS HERE

 

Leading Edge Homes - Home Improvement for Hurricane Season

HURRICANES – STAY AWAY

The dog days of summer are already here.  We seem to have skipped Spring and gone right into Summer.  What does that mean for Florida residents?

It’s time for the media to bombard us with hurricane preparedness news and alarm us about every tropical wave, depression, and potential hurricane – even if it is weeks away. It’s enough to make sane people crazy.

OVER TEN YEARS SINCE THE LAST HURRICANE

Mother nature has been extremely kind to us during the past ten years. The last hurricane to make landfall in Florida was Wilma on October 24, 2005.  For many of us, that is a life time ago, and for new homeowners and new Florida residents, they may have never experienced a hurricane.

Although I am not a fan of the constant reminders of how to prepare for a hurricane, it’s not something to be ignored.  Procrastinating on getting your home ready can make a hurricane that much more difficult to endure. Everyone should have evacuation plans in place and makes sure their homes are as secure as possible. The Palm Beach County website http://www.pbcgov.com/dem/hurricane/ has a guide to help you get prepared… just in case.

ARE YOUR HURRICANE SHUTTERS WORKING PROPERLY?

But more importantly, now is the time to install hurricane protection or check your hurricane shutters and make sure they work and close securely. If something is broken, and is easier to repair it now rather than when a storm is approaching.
The Sun Sentinel posted a guide to choosing hurricane shutters.  Below are the highlights of the article:
STEEL or ALUMINUM HURRICANE SHUTTERS

Attached to the walls around windows and doors on bolts or tracks.  The panels are corrugated, and each piece overlaps the next for maximum strength.

THE BIGGEST PROBLEM WITH STORM PANELS IS THAT MOST HOMEOWNERS OFTEN DON’T CHECK THEM WHEN THEY BUY A HOME. MANY DISCOVER TOO LATE THAT THE PANELS ARE MISSING OR WERE CUT IMPROPERLY OR ARE TOO HEAVY TO INSTALL!

PROS
Most inexpensive of the permanent shutter systems.

— Removable, so they don’t change the look of the house when not in use.
— Strong, and can provide excellent protection for both doors and windows.

CONS
Require storage

— Large panels are difficult to handle; hanging can require more than one person.
— Sometimes don’t line up properly.
— Have sharp edges and working without gloves can lead to serious injury

ACCORDION HURRICANE SHUTTERS

These one- or two-piece hurricane shutters are housed beside the windows or doors when not in use. They unfold accordion-style to cover and protect during a storm.

PROS
— Permanently affixed beside the windows and don’t require any extra storage space.
— Can easily be made storm-ready by one person.

CONS
— Can look bulky and out-of-place on some houses. 
— Glide on wheels, and have the potential to break more easily than some of the other systems.

BAHAMA HURRICANE SHUTTERS

These one-piece louvered shutters attach directly above the windows and prop open to provide shade for the window. Bahama shutters are storm-ready when lowered and secured to the wall.

PROS
— Permanently affixed beside the windows and don’t require any extra storage space.
— Can easily be made storm-ready by one person.
— Provide permanent shade and privacy, even in the open position.

CONS
— Have traditionally been weaker than other systems, but the newest models protect well.
— Design limits their use. They can’t be used to protect doors.

ROLL DOWN HURRICANE SHUTTERS

These shutters attach above the window. They roll up and store in an enclosed box when not in use. They are lowered either manually by a hand crank or automatically by push button, and lock in place for storm protection.

PROS
— Are permanently affixed above the windows and don’t require any extra storage space.
— Can easily be made storm-ready by one person.
— Offer some of the best protection, and make an excellent theft deterrent.

CONS

— Most expensive of the popular shutter systems.
— Push-button-operated roll-down shutters require a battery backup system so the shutters can be lowered and raised during power outages.

HURRICANE IMPACT GLASS

This glass can withstand hurricane debris and eliminate the need for hurricane shutters. It costs more, especially to retrofit an older house. Modern code requirements, which already require hurricane shutters or other protections on new houses, make the glass a more practical option at the time of construction.

PROS
— Eliminates the need for hurricane shutters.
— The most practical hurricane glass is similar to a car windshield, with a durable plastic-like layer sandwiched between glass. The outside layers break, but the center prevents a hole. BUT IF IT IS HIT MULTIPLE TIMES IN THE SAME SPOT IT MAY BREAK.

CONS
— Must be installed by a window contractor.
— The frame must be replaced along with the panes to meet code.

LEADING EDGE HOMES CAN CHECK YOUR HURRICANE PROTECTION BEFORE IT’S TOO LATE

If you need new hurricane shutters or want to make sure yours are ready for the hurricane season, contact Leading Edge Homes, Inc. at 561-795-2551.  Like a good boy scout “BE PREPARED!”


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

Are You Done Yet – Understanding the Remodeling Process

“ARE YOU DONE YET?” – UNDERSTANDING THE REMODELING PROCESS

No, home remodeling is not like what you see on television - it takes time.

No, home remodeling is not like what you see on television – it takes time.

 

HOW LONG WILL IT TAKE?

As a contractor, my two least favorite questions are “How long will it take?” and “Are You Done Yet?”  Perhaps it is because it reminds me of the long trips in the car when my children were young and they asked the infamous question “Are we there yet?”

To answer the question “how long will it take,” there is no clear cut answer. No two jobs are alike. Construction phases take varying amounts of time.

The outline below is a general guideline of what to expect during a home remodeling experience.  One thing to remember is that you may not see someone at your site daily when you do a home remodeling project.  Scheduling, weather, inspections, and material availability all play a part in how long your project takes to complete.

HOME REMODELING PROCESS / STEPS

If you read through all of the following steps, you will see that there are many moving parts that must be coordinated to complete a project. Leading Edge Homes, Inc. tries to ensure that your home improvement project moves along as quickly as possible, but will never sacrifice quality for speed.  

Please note, not all of the following steps are required for each type of job. Each step is prefaced with an “A” for an Addition and  “R” for a Remodeling / Renovation project.

APRELIMINARY SOIL TESTS / SURVEYS

ARREROUTING WIRES OR PLUMBING

Rerouting of overhead electric, cable TV,  and phone service, and sewer and water supply lines if necessary.

ARDEMOLITION

Any existing structures (roof overhangs, screen rooms, existing concrete, etc.) in the way of the addition are removed.  Land is cleared by machinery if site conditions allow, otherwise it is cleared by hand.

For an interior remodel, the cabinets, walls, floor coverings, and fixtures in the work area are removed.  This creates lots of dust.  Make sure any objects that could not be removed are protected.

Debris is placed in a designated area or in the provided trash receptacle.  Leading Edge Homes, tries to clean up the site daily, however, at times piles of debris are visible.

AEXCAVATION AND SETTING FORMS

The addition area plus at least 3 feet beyond are cleared down to suitable soil.

Fill dirt is delivered to the addition area and compacted.  Please do not remove any of this dirt.  It is needed to create the house pad.

Footers are dug around the addition perimeter and forms are placed into the dirt.

These forms are set in place with precision instruments, and a survey will be taken with them in place.  Do not move or alter them in any way.  Should you accidentally step on or disturb one of these forms, please contact the office immediately so the forms can be rechecked for accuracy before the concrete pour.

A soil density test is conducted.

A form board survey is performed.

AUNDERGROUND UTILITIES

The underground plumbing, electric, and air conditioning pipes are placed in what becomes the slab.  Do not remove or change the position of any of these items.  They have been placed in the precise location in which they are needed.

Separate inspections for each of these trades is performed.  Inspections may not occur on the same day.  All trades must pass inspection before work can proceed.

APOISON THE SOIL

This is the first of two sprayings to prevent termites.  Do not touch the soil!  It is hazardous to your health.

ASLAB FORMATION COMPLETION

Plastic, steel (it may be rusted, but that does not effect the strength of the slab), and recess forms are put into place.

Another inspection is performed.

APOUR THE CONCRETE

Once the pad is formed and passes all inspections, the slab will be poured.  This is a difficult date to schedule.  It is subject to weather conditions (on the date of the pour and on prior days), equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.  We are as anxious as you to complete this phase. If you can’t resist, please wait at least 24 hours after the concrete finishers have left before walking on the new concrete.

Some concrete may squeeze out from under or around the forms.  This is a normal condition.

Loads of concrete may vary in color.  This is a normal condition and does not affect performance.

Cracking may occur during the first 90 days of curing, and later during the first year.  Steel reinforcement has been installed in the slab to reduce the separation of the concrete when it cracks.  (The concrete will be specially prepared if tile is to be installed on it.)

Sudden inclement weather conditions may require protecting wet concrete with a temporary plastic covering.  This may result in an alteration of the finished appearance of the concrete surface.  Do not be concerned.  This does not affect the concrete’s performance.

ABUILD EXTERIOR WALLS AND ROOF

Wood / Steel Framed Construction

The exterior walls are framed with wood and / or steel.

The roof trusses are set, sheathing is attached to the trusses and exterior walls, and the fascia is installed.

It is time for another inspection.

Block / Masonry Construction

The exterior walls are built with masonry block.

The column and beam steel is installed.

The tie beam is formed, where and if needed.

It is time for another inspection.

Wood scraps are fastened over any column clean out holes.

Concrete is poured into the tie beam and columns.

Note: This concrete is a special mix and appears to be watery! Do not be concerned. Its formulation causes it to be extremely strong when dry.

The roof trusses are set, sheathing is attached to the trusses, and fascia is installed.

It is time for another inspection.

AROOF COVERING

The roof is dried in.  Roofing underlayment is attached to the sheathing, and metal drip edge, valley, and “L” flashing is installed.

Skylights (if any) are installed.

It is time for another inspection.

If the final roof covering is tile, more roofing underlayment may be installed, and the tile is loaded on the roof.  Otherwise, the final roofing material is installed on the roof.

A R INTERIOR FRAMING

The window bucks and windows are installed.

The exterior door bucks and doors are installed.

Interior walls are framed and block walls are firred as necessary.

You can now see your room(s).  They may appear smaller than you expected, but will look larger once the drywall is installed.

The rough air conditioning (duct work), plumbing (including tubs), and electric are installed.

It is time for more inspections.

APREPARING THE HOUSE EXTERIOR

Wire lath is installed over exterior sheathing, and in the soffits.

Scaffolding may be present on your job site.  DO NOT allow children to play on it.

Hurricane tracks are installed (if they are embedded in the stucco).

It is time for another inspection.

The exterior is painted, then roof tile, if applicable, is installed.

A R  —   INSULATION

Insulation is installed in the walls and ceilings.

It is time for another inspection.

 

A R     DRYWALL

Drywall is fastened to walls and ceilings.

In most municipalities, it is time for another inspection.

The walls and ceilings are finished.  This multi-step process is effected by humidity, and requires varying amounts of drying time.

Wall and ceilings are spray textured, if applicable.

 

A RINTERIOR FINISHING TOUCHES

Interior doors are hung, and pull down stairways are installed.

Cabinets are installed.

Interior base and case moldings are installed.

Tile is installed on floors and walls, if and where applicable.

The interior is painted.

Shelving, mirrors, countertops, and tub skirts are installed.

The air conditioning equipment and grills are installed.

The final plumbing fixtures and faucets are installed.

The electric switches, outlets and fixtures are installed.

It is time for inspection of all the trades.

 

A EXTERIOR FINISHING

Hurricane hardware is installed.

The flatwork (sidewalks, patio areas, etc.) is formed.  Soil in areas  under roof are sprayed to prevent termites.  Do not touch the soil!  It is hazardous to your health.

Reinforcing steel may, or may not, be placed in the flatwork area.

The flat work is inspected.

The concrete is poured.  This is a difficult date to schedule, due to weather conditions (on the date of the pour and prior days),  equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.

You may walk on the new concrete 24 hours after the pour.  Do not drive on a new concrete driveway for at least one week.

Loads of concrete may vary in color, and will NOT be the same color as existing sidewalk, driveway, or patio areas.  There is no way to control the color variations of concrete.

The final vertical spray for termites is performed.

Any sod replacement and sprinkler repair specified is performed.

A RTHE PROJECT IS ALMOST DONE

Screens are installed in any windows.  The dumpster and portable toilet will be removed from your site.

 

The FINAL BUILDING INSPECTION is performed.

 

The carpeting is installed. This is done after the final inspection because we want no one to walk on your new carpet but you!

A RENJOY YOUR FINISHED PROJECT

Leading Edge Homes thanks you for your patience and hopes you enjoy the changes to your home.

 

If you are considering a home remodeling project or have been inspired by something you have seen on television and want to determine if it can be duplicated in your home, contact Leading Edge Homes, Inc. at 561-795-2551.  We will give you a real, guaranteed price and our best guestimate of how long the project will take.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

HOME REMODELING: I MADE A HOMEOWNER CRY

TRUE CONFESSIONS OF A REMODELING CONTRACTOR:  MAKING A HOMEOWNER CRY

Nothing is worse than having to tell a homeowner they have been scammed.

Nothing is worse than having to tell a homeowner they have been scammed.

 

MAKING A HOMEOWNER CRY

This has been one of the toughest month’s for me as a home remodeling contractor.

Two of the potential clients that I visited with were brought to tears and another one was strong enough to hold back the tears but realized they threw away money.

WHAT WENT WRONG

The first of my heart breaking experiences happened in Palm Beach Gardens.  A woman, had a leak, which unfortunately led to mold.

But… the people she hired to “fix it” removed anything and everything that they could, down to the metal studs that were part of her exterior walls.

There is no easy fix to put her home back together, especially because it is part of a quadruplex. The homeowners association won’t let her rip down what is remaining from the exterior walls and now they are in danger of collapsing, her insurance company is denying the claim, and the “friends” that helped her weren’t licensed.

WARNING:  ALWAYS VERIFY THAT THE PEOPLE YOU HIRE TO WORK ON YOUR HOME ARE PROPERLY LICENSED read more 

The only remedy she has is to hire a public adjuster to help her navigate the insurance company process and to hire a construction attorney to help her recoup her costs from the work that was done improperly.  Until she gets the homeowners association to grant her permission to fix the exterior walls, she is in limbo.

The next of my heart breaking experiences happened in Wellington where work was done without a permit and the second contractor is no where to be found.

A homeowner needed work done on his home. The “contractor” who only could work weekends was caught doing work on the home without a permit. The Village of Wellington issued a stop work order, fined the homeowner, and had the electric meter pulled from the house as a safety precaution.

The homeowner, after paying fines, hired another contractor. But, this contractor is now missing in action. I advised the homeowner that I could not do any work on the home unless the permit was closed. Like the previous homeowner, this job will remain in limbo until the legal ramifications are solved.

WARNING: FAILURE TO GET A PERMIT CAN CAUSE YOUR JOB TO BE SHUT DOWN! – read more 

The last my heart breaking experiences this week also happened in Wellington.

A homeowner wanted to remodel their kitchen and have an addition put on their home. They hired a draftsman to draw up the plans. The plans did not reflect what the homeowner wanted! The plans were what the designer wanted to draw.

As a design-build contractor I have seen this time and time again. Some draftsmen or architects don’t understand the big picture and don’t understand how things are tied together. The homeowner, throughout our meeting, kept saying “but that is what I wanted.”

It is very frustrating to me that homeowners waste money on plans that won’t work. It is not that every designer/draftsman does a poor job… but I have seen it way too many times that plans are not usable because they are incomplete, don’t meet the homeowner requirements, or they are drawn incorrectly.

I’D LIKE TO SCREAM FROM THE ROOF TOPS – HIRE A DESIGN-BUILD CONTRACTOR! IT GIVES YOU A CONTRACTOR THAT CAN NOT ONLY DRAW YOUR PLANS BUT ALSO BUILD THEM TO YOUR SPECIFICATIONS!  read more

 BEFORE YOU CHOOSE TO DO A REMODEL

Think about how your change will effect the look of your home. Realize that the newer things may alter how the rest of your home looks. That doesn’t mean you don’t make changes.  But… think about how your changes can affect your vision of your home.

If you are changing the floors, do you want to change the doors, their thresholds, the moldings? If you are adding additional cabinets, how are you going to tie the cabinets together?  Will you need to resurface the old cabinets, change out all of the hardware, or replace everything?

Making all the cabinet pulls the same may not be so easy. How the new handles get installed may not cover old holes. The old hardware may not easily be removed.

When you do choose to remodel, look for someone with good listening skills who shares your vision for what your home should look like. Feel free to ask for references. Then, before you sign on the dotted line, check with your state to ensure your architect or custom builder is licensed in his or her field.

FOR ASSISTANCE IN PLANNING YOUR PROJECT

If you have questions about the design process or a project you are considering, contact your local design-build contractor, Leading Edge Homes. Inc. Want to see some of our work? Visit our website or view our online book.

For all of your new home, home remodeling and inspection needs, contact your local certified “roomologist”, Leading Edge Homes. Inc. at 561-795-2551.

Want to see some of our work? Visit our website or view our online book.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

HOME REMODELING: STEEL STUDS vs. WOOD STUDS

Interior Partition Wall Steel Studs VS Wood Studs:  Which Is Better?

Home Improvement - Metal Studs vs Wood Studs

Often, when I am doing a remodeling job, I am asked why am I using steel studs instead of wood studs. Although the price may be slightly higher, the real costs can be lower – and that is better for you!

Cost of Metal Studs Can Be Lower Than Wood (even though the price is higher per foot)

There are some nuances to this area. Steel framing can cost three to 15 percent more than wood studs, based on Steel Framing Alliance calculations, but metal studs offer cost advantages in other areas that can offset this price difference.

Steel does not shrink, split or warp. As a result, there are no nail pops or drywall cracks to fix after the structure is completed.

Consistent quality means that scrap is drastically reduced (two percent for steel versus 20 percent for wood), which also reduces costs for hauling off and disposing of discarded material.

Most importantly, steel framed walls can be erected faster than wood ones saving on labor costs

Potential Problems with Wooden Studs

With wooden studs, you have to worry about problems like rotting, warping, shrinking, cracking and splitting. Termites, other insects and mold can also quickly destroy wooden studs under the right conditions.

Finding quality lumber to use as studs can also be difficult; it varies widely depending on where the wood is grown. Lumber also has to be sorted carefully and you can’t use any pieces that aren’t straight or have knots, cracks or other imperfections.

As much as 20 percent of the lumber bought for studs ends up wasted, and since wood prices can fluctuate, trying to budget for a construction project is challenging.

 

Metal Studs Are More Convenient

Metal is lighter than wood. Steel framing is easier to handle because the studs weigh a third less than wood and can be installed at 24 inches on center.

They take up half the space of lumber because of its hollowed shape. This makes for easier transporting and storage.

Metal studs can be cut with aviation snips, which means no sawdust.

They also are attached with screws, so moving studs is simple if you make a mistake.

Metal Studs Are More Stable

Wood is prone to twisting and warping; metal is not so walls are straighter. Wood also wicks moisture, which can lead to mold growth and rot, while metal is immune.

Metal Studs Are The Environmentally Responsible Choice

Metal studs are made from recycled metal – they could have been a car fender in a previous “life”. Once a tree is cut down, it’s gone.  It takes years for a new one to grow in its place.

 

 

Knowing your what materials are better for your home remodeling projects will add value to your investment. “Cheaper” is not better, you need to know the true costs.

If you are considering a home improvement project or you need some maintenance advice, contact your local certified “roomologist”, Leading Edge Homes. Inc. at 561-795-2551.

Want to see some of our work? Visit our website or view our online book.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Home Improvement: AIR CONDITIONERS OLDER THAN 2010 HAVE LITTLE LIFE LEFT

WAS YOUR AIR CONDITIONER BORN BEFORE 2010?

If your air conditioner was born before 2010 it is obsolete.

If your air conditioner was born before 2010 it has five years until it is obsolete.

GOOD-BYE FREON – HELLO R-410A (Puron)

The U.S. Environmental Protection Agency, along with the environmental agencies of many other nations around the world, joined together to enact a Freon phase out.

This phase out was created due to scientific evidence that Freon destroys the ozone layer that protects the earth from harmful ultraviolet sun rays and it contributes to the phenomenon of climate change.

In January 2010, air conditioning system manufacturers stopped producing equipment that utilizes Freon as the coolant.

HOW THIS AFFECTS YOU

Scenario 1 – A True Story

Last week, I went to look at a house that someone bought at an auction. The condenser (outside unit) was stolen and now has to be replaced. The problem is, manufacturers no longer make condensing units that are compatible with the air handler that still uses Freon. The buyer will have to purchase both an air handler and a condensing unit – a cost that he did not know about before placing a bid on this house.

Scenario 2 – What If?

If your air conditioning system that uses Freon as the coolant develops a coolant leak or another mechanical or electrical problem, you must make a decision between repair and replacement. As Freon becomes more expensive and increasingly difficult to obtain, the cost of recharging the system will continue to rise. It may mean an A/C upgrade is a better choice.

DO I NEED TO CHANGE NOW?

Unless you are having a problem, I would not recommend changing your system now.  But, the newer air conditioning systems are more efficient and by installing one, you may save money on your electric bills.

HOWEVER – IN FIVE YEARS FREON WILL NO LONG BE AVAILABLE

The phase out of Freon, which began in 2010,  is taking place over the course of about 20 years. In existing air conditioning systems, Freon can be used to recharge the equipment until January 1, 2020.

Due to the decrease in the supply of Freon, the cost of Freon has significantly increased and the number of companies that have access to it is getting smaller and smaller. Homeowners who discover that their air conditioners have a Freon leak may end up spending several hundred dollars for a recharge of the system.

Who would have thought that something installed five years ago may only have a life expectancy of another five years.

Knowing your options now, will help you be prepared in the future. If your home is aging and you need some maintenance advice, contact your local certified “roomologist”, Leading Edge Homes. Inc. at 561-795-2551.

Want to see some of our work? Visit our website or view our online book.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Home Improvement: HOMEOWNER’S NIGHTMARE — WHERE DO WORKMEN GO TO THE BATHROOM?

Home Improvement Contractors Have to Go to the Bathroom Too…

 

We don’t like to talk about it, but everyone needs to go to the bathroom at some time. But, what happens when you have workmen working on your house?

No... you don't need to hang toilet paper from your trees if you have workmen at your house.

No… you don’t need to hang toilet paper from your trees if you have workmen at your house.

There are many horror stories such as “workmen have been using my yard as their toilet! I just caught one urinating and told him my yard is not a ‘toilet’.” In another case, I heard about workers asking if they could go behind the garage to go to the bathroom. I can only imagine what else they might be doing in the yard.

Rules and Regulations

These workmen should not be using your yard, garage wall, or anything else other than a toilet!  According to the Occupational Safety and Health Administration (OSHA)

Toilet facilities shall be provided and maintained in a sanitary condition during construction. An adequate number of facilities must be provided for the number of employees at the construction site according to the following

1 to 20 workers- 1 toilet
21 to 200 workers- 1 for each 40 workers
over 200 workers= 1 for each 50 work

The toilet facility can be yours or one provided by your contractor.

Your Bathroom or a Port-A-Potty?

Do you want the workmen to use your facility or a port-a-potty provided by the contractor?  Of course that is a personal preference.

You have hired a contractor that you trust. Perhaps you can extend this trust to using your bathroom.  But, not everyone is comfortable having strangers use their bathrooms nor do they want to clean up after them.

Leading Edge Homes, Inc. doesn’t want to put your privacy at risk and never wants a customer to feel obligated to allow workmen to use their bathroom. Employees and subcontractors are instructed to use a port-a-potty that is delivered to the job site.

If possible, Leading Edge Homes, Inc. builds a temporary shroud around the port-a-potty in an attempt to make it less unsightly for your neighbors.

 

Before you hire a contractor you might want to ask what are their employees instructed to do in the event that they need to use the bathroom.  Furthermore, if the job will take more than a week, does the contractor provide a port-a-potty? If he is unwilling to spend about $100 a month for your safety and privacy, what other corners will he cut?


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

Home Improvement: FINDING YOUR CONTRACTOR THROUGH AN ONLINE SERVICE – SCAM OR NOT?

Online Contractor Referrals: The Hidden Truth

Online contractor referral services are really pay to play... Just you may not pay directly.

Online contractor referral services are really pay to play… Just you may not pay directly.

An article was published in the Seattle Times online last week.   As background, Seattle is the home of Amazon, Porch, and Pro.com, three of the big players in the lead-generation industry.  (Hmmm… this is suspiciously convenient!)

BIG RED FLAG – No reputable contractor gives a price for a project without first seeing the house, site conditions, asking the homeowners detailed questions, etc.

 

The article’s goal was to let homeowners know they should be going online and using lead-generating companies to find a contractor.  One of the things the article says is: “The technology enables customers to find contractors, price jobs and even schedule appointments – without leaving the couch.”
Although the article doesn’t directly say it, it comes pretty darned close to saying contractors can’t be trusted without the oversight of lead-generation companies:
“It’s an industry that totally lacks transparency and trust,” said Pro.com CEO Matt Williams.

Lead Generation Companies Don’t Vet Contractors

So, lead-generating companies are marketing themselves to homeowners as the only way to find a trustworthy contractor.  But what’s in it for these companies?  They want to sell each lead to as many as four contractors, who then have to either raise their prices or cut corners to cover the lead costs. In reality, homeowners will be the ones paying for the use of these middlemen even though their service is touted as “free”.

 

These companies do no better of a job vetting a contractor than you can, and they don’t want to.  They just want to sell leads.  So long as a contractor keeps buying leads, they’re happy and have no reason to ban them.

Best Way to Find A Trustworthy Contractor

In reality, the best way for a consumer to find a trustworthy contractor online is to visit contractors’ websites and watch videos from, and talk to, their clients. Consumers can and should vet a contractor (such as checking for licenses, insurance, references, etc.), but testimonials from past clients are priceless.
These lead generation companies don’t understand how the industry works; they just want to make money off it.  They don’t realize that remodeling and specialty contractors don’t provide a commodity, they provide a service.  Having repairs done, or a bookcase built, isn’t like buying a book or a dress or a pair of shoes that can be returned.

Home Remodeling Done One House At A Time

Contrary to the theme of the article, the home remodeling industry hasn’t moved online.  It’s still done one home at a time, one project at a time, using the hands of craftsmen who know their trade and do it well.

 

Besides, you already know a trustworthy contractor – Leading Edge Homes.  Whenever a project comes up, please call us at 561-795-2551 and we will be happy to complete it for you.

Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

HOME REMODELING: YOUR CONTRACTOR IS MORE THAN A BUILDER

Ten Hats (or titles)Your Remodeling Contractor Wears  

Home remodeling contractors are more than a builder...

Home remodeling contractors are more than a builder…

It may be hard to believe… but your home remodeling specialist does more than construction.  He also is a…

Therapist.

Remodeling is stressful –  there are delays, dust, etc.  Sometimes clients just want to vent about something that happened at work.  If we think we can somehow segue into getting them to finally deciding what calming color they would like us to paint their new bedroom, we’ll probably hang in there.

Mediator.

There are many parties involved in a project – homeowner, sub-contractors, inspectors, materialmen.  When disagreements or issues occur, someone has to keep the peace or straighten things out.  Since the contractor has the most at stake, he usually must take on this role.

Marriage Counselor.

Often husbands and wives can not agree on design, window placement, colors, and the many other decisions that must be made on the typical project.  Often times they don’t communicate clearly with each other.  A good contractor never takes sides, but coaxes a decision without ruffling any feathers.

Financial Advisor.

Contractors are used to dealing with banks, insurance agents, and the mortgage process.  Use their expertise, especially when they recommend having 10 – 20% of the contract price available in a contingency fund to take care of any unforeseen problems that may arise or upgrades you may add along the way.

Secretary.

There are many notes that contractors take before and during a project, not to mention texts and emails that must be acted upon.  A contractor must keep an accurate record of all communications to successfully complete a project with happy homeowners.

Realist.

Clients sometimes get carried away with their wishes before and once a project has started.  It’s the contractors job to explain the financial and time implications for each requested change.

Real Estate Advisor.

Contractors sometimes see as many houses in a neighborhood as Realtors do.  They can often tell you if you are overimproving your house, not to mention how much the project you are considering will cost.  Honest ones will tell you if it would be more cost effective to move than improve.

Your Home’s Best Friend.

Contractors are very observant people.  If we see a clogged up HVAC filter, we will tell you.  If we hear grinding bearings in a pool or irrigation pump, we will tell you.  If we smell a burning electrical component, we will tell you.  We are “house whisperers”!

Translator.

Engineers, carpenters, block masons, plumbers, electricians, cabinet makers – they all use terms that are foreign to most homeowners.  Contractors speak many “languages” and know exactly when to explain when that look on a homeowners face says “Huh?”

Builder.

When not wearing one or more of the hats explained above, contractors get to put on a toolbelt and actually construct something.  Although a cell phone might seem to be our most used tool, we really do know how to use a hammer and circular saw.

Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

HOME IMPROVEMENT: BEING YOUR OWN GENERAL CONTRACTOR CAN COST YOU

So You Want to Be Your Own Contractor

Are you sure you want to be your own general contractor?

IT WILL BE LESS EXPENSIVE TO DO THE WORK YOURSELF — REALLY?

One of the most common misconceptions about home remodeling is that it will be less expensive to do the work yourself or act as your own general contractor.

THINGS TO CONSIDER BEFORE DOING A DIY HOME REMODELING PROJECT

There are many things to consider before beginning a home remodeling project on your own.

SUBCONTRACTOR LICENSE VERIFICATION

First, you need to verify that every subcontractor or tradesmen you hire has the correct license and carries insurance.  If a person does not have Worker’s Compensation Insurance, or an exemption, then you are liable for their lost wages and medical bills if they get hurt while working on your home.

WHAT IF THE TRADESMEN DAMAGE YOUR HOME?

What happens if one of the tradesmen damages your home?  Your homeowner’s policy will not cover the damage caused by them.  A general contractor carries both general liability and builder’s risk insurance policies to protect you.

PERMITS… PERMITS… PERMITS

Although you can typically pull a building permit for your job if you live in a single family home, will the subcontractors you hire be able to pull their permits?  If you live in a multi-family dwelling, you will not be able to pull your own building permit.

Failure to pull a permit can cost you three times the original cost of a permit if the building department catches you.

If you decide to pull your own building permit, you will have to schedule your inspections, may need to take time off from work to meet with building inspectors, and you will have to take responsibility for all the work performed on your home.

WILL YOU BE AVAILABLE FOR INSPECTIONS? – TAKE A VACATION DAY

You may have to rely on the electrician, plumber, mechanical contractor, and roofer to pull their own permits and schedule their own inspections.  You still may have to take time off from work to make your house available to them and their building inspectors.

How much is your time worth?  When you schedule subcontractors and inspectors to come to your home you must ensure access to your house

BUILDING CODES… HOW MUCH DO YOU KNOW?

Do you know the latest building codes?  If you do not build to the current codes or hire subcontractors who do not build to the current Florida Building Codes, you could end up wasting money having to redo work.

PRICING…  YOU WILL PAY RETAIL FOR YOUR SUBCONTRACTORS

You may think you are saving money by contracting with trades directly, but they have multiple sets of prices.  One for contractors they work with all year long, one for the occasional contractor, and one for the public.   The public pays the highest price.

WHICH COMES FIRST… THE CHICKEN OR THE EGG?

It is critical to know the order in which subcontractors need to perform their work.  If you get the order wrong, you may need to remove a subcontractor’s work.  This will not only cost time, but money as well.

These are just a few of the potential issues that you may run into if you decide to act as your own general contractor.  Before following this path, consider the risks, the time you may waste, the monetary losses you could face, and the added stress of completing your home remodeling project.

 

Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
To ask Todd a question, contact him at 561-795-2551 or visit the Leading Edge Home’s website to discover how they can help you with your next home remodeling project in Palm Beach County.