Are You Done Yet – Understanding the Remodeling Process

“ARE YOU DONE YET?” – UNDERSTANDING THE REMODELING PROCESS

No, home remodeling is not like what you see on television - it takes time.

No, home remodeling is not like what you see on television – it takes time.

 

HOW LONG WILL IT TAKE?

As a contractor, my two least favorite questions are “How long will it take?” and “Are You Done Yet?”  Perhaps it is because it reminds me of the long trips in the car when my children were young and they asked the infamous question “Are we there yet?”

To answer the question “how long will it take,” there is no clear cut answer. No two jobs are alike. Construction phases take varying amounts of time.

The outline below is a general guideline of what to expect during a home remodeling experience.  One thing to remember is that you may not see someone at your site daily when you do a home remodeling project.  Scheduling, weather, inspections, and material availability all play a part in how long your project takes to complete.

HOME REMODELING PROCESS / STEPS

If you read through all of the following steps, you will see that there are many moving parts that must be coordinated to complete a project. Leading Edge Homes, Inc. tries to ensure that your home improvement project moves along as quickly as possible, but will never sacrifice quality for speed.  

Please note, not all of the following steps are required for each type of job. Each step is prefaced with an “A” for an Addition and  “R” for a Remodeling / Renovation project.

APRELIMINARY SOIL TESTS / SURVEYS

ARREROUTING WIRES OR PLUMBING

Rerouting of overhead electric, cable TV,  and phone service, and sewer and water supply lines if necessary.

ARDEMOLITION

Any existing structures (roof overhangs, screen rooms, existing concrete, etc.) in the way of the addition are removed.  Land is cleared by machinery if site conditions allow, otherwise it is cleared by hand.

For an interior remodel, the cabinets, walls, floor coverings, and fixtures in the work area are removed.  This creates lots of dust.  Make sure any objects that could not be removed are protected.

Debris is placed in a designated area or in the provided trash receptacle.  Leading Edge Homes, tries to clean up the site daily, however, at times piles of debris are visible.

AEXCAVATION AND SETTING FORMS

The addition area plus at least 3 feet beyond are cleared down to suitable soil.

Fill dirt is delivered to the addition area and compacted.  Please do not remove any of this dirt.  It is needed to create the house pad.

Footers are dug around the addition perimeter and forms are placed into the dirt.

These forms are set in place with precision instruments, and a survey will be taken with them in place.  Do not move or alter them in any way.  Should you accidentally step on or disturb one of these forms, please contact the office immediately so the forms can be rechecked for accuracy before the concrete pour.

A soil density test is conducted.

A form board survey is performed.

AUNDERGROUND UTILITIES

The underground plumbing, electric, and air conditioning pipes are placed in what becomes the slab.  Do not remove or change the position of any of these items.  They have been placed in the precise location in which they are needed.

Separate inspections for each of these trades is performed.  Inspections may not occur on the same day.  All trades must pass inspection before work can proceed.

APOISON THE SOIL

This is the first of two sprayings to prevent termites.  Do not touch the soil!  It is hazardous to your health.

ASLAB FORMATION COMPLETION

Plastic, steel (it may be rusted, but that does not effect the strength of the slab), and recess forms are put into place.

Another inspection is performed.

APOUR THE CONCRETE

Once the pad is formed and passes all inspections, the slab will be poured.  This is a difficult date to schedule.  It is subject to weather conditions (on the date of the pour and on prior days), equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.  We are as anxious as you to complete this phase. If you can’t resist, please wait at least 24 hours after the concrete finishers have left before walking on the new concrete.

Some concrete may squeeze out from under or around the forms.  This is a normal condition.

Loads of concrete may vary in color.  This is a normal condition and does not affect performance.

Cracking may occur during the first 90 days of curing, and later during the first year.  Steel reinforcement has been installed in the slab to reduce the separation of the concrete when it cracks.  (The concrete will be specially prepared if tile is to be installed on it.)

Sudden inclement weather conditions may require protecting wet concrete with a temporary plastic covering.  This may result in an alteration of the finished appearance of the concrete surface.  Do not be concerned.  This does not affect the concrete’s performance.

ABUILD EXTERIOR WALLS AND ROOF

Wood / Steel Framed Construction

The exterior walls are framed with wood and / or steel.

The roof trusses are set, sheathing is attached to the trusses and exterior walls, and the fascia is installed.

It is time for another inspection.

Block / Masonry Construction

The exterior walls are built with masonry block.

The column and beam steel is installed.

The tie beam is formed, where and if needed.

It is time for another inspection.

Wood scraps are fastened over any column clean out holes.

Concrete is poured into the tie beam and columns.

Note: This concrete is a special mix and appears to be watery! Do not be concerned. Its formulation causes it to be extremely strong when dry.

The roof trusses are set, sheathing is attached to the trusses, and fascia is installed.

It is time for another inspection.

AROOF COVERING

The roof is dried in.  Roofing underlayment is attached to the sheathing, and metal drip edge, valley, and “L” flashing is installed.

Skylights (if any) are installed.

It is time for another inspection.

If the final roof covering is tile, more roofing underlayment may be installed, and the tile is loaded on the roof.  Otherwise, the final roofing material is installed on the roof.

A R INTERIOR FRAMING

The window bucks and windows are installed.

The exterior door bucks and doors are installed.

Interior walls are framed and block walls are firred as necessary.

You can now see your room(s).  They may appear smaller than you expected, but will look larger once the drywall is installed.

The rough air conditioning (duct work), plumbing (including tubs), and electric are installed.

It is time for more inspections.

APREPARING THE HOUSE EXTERIOR

Wire lath is installed over exterior sheathing, and in the soffits.

Scaffolding may be present on your job site.  DO NOT allow children to play on it.

Hurricane tracks are installed (if they are embedded in the stucco).

It is time for another inspection.

The exterior is painted, then roof tile, if applicable, is installed.

A R  —   INSULATION

Insulation is installed in the walls and ceilings.

It is time for another inspection.

 

A R     DRYWALL

Drywall is fastened to walls and ceilings.

In most municipalities, it is time for another inspection.

The walls and ceilings are finished.  This multi-step process is effected by humidity, and requires varying amounts of drying time.

Wall and ceilings are spray textured, if applicable.

 

A RINTERIOR FINISHING TOUCHES

Interior doors are hung, and pull down stairways are installed.

Cabinets are installed.

Interior base and case moldings are installed.

Tile is installed on floors and walls, if and where applicable.

The interior is painted.

Shelving, mirrors, countertops, and tub skirts are installed.

The air conditioning equipment and grills are installed.

The final plumbing fixtures and faucets are installed.

The electric switches, outlets and fixtures are installed.

It is time for inspection of all the trades.

 

A EXTERIOR FINISHING

Hurricane hardware is installed.

The flatwork (sidewalks, patio areas, etc.) is formed.  Soil in areas  under roof are sprayed to prevent termites.  Do not touch the soil!  It is hazardous to your health.

Reinforcing steel may, or may not, be placed in the flatwork area.

The flat work is inspected.

The concrete is poured.  This is a difficult date to schedule, due to weather conditions (on the date of the pour and prior days),  equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.

You may walk on the new concrete 24 hours after the pour.  Do not drive on a new concrete driveway for at least one week.

Loads of concrete may vary in color, and will NOT be the same color as existing sidewalk, driveway, or patio areas.  There is no way to control the color variations of concrete.

The final vertical spray for termites is performed.

Any sod replacement and sprinkler repair specified is performed.

A RTHE PROJECT IS ALMOST DONE

Screens are installed in any windows.  The dumpster and portable toilet will be removed from your site.

 

The FINAL BUILDING INSPECTION is performed.

 

The carpeting is installed. This is done after the final inspection because we want no one to walk on your new carpet but you!

A RENJOY YOUR FINISHED PROJECT

Leading Edge Homes thanks you for your patience and hopes you enjoy the changes to your home.

 

If you are considering a home remodeling project or have been inspired by something you have seen on television and want to determine if it can be duplicated in your home, contact Leading Edge Homes, Inc. at 561-795-2551.  We will give you a real, guaranteed price and our best guestimate of how long the project will take.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Maintenance: FLOOD THWARTED BY ANTS

GARBAGE DISPOSAL LEAK THWARTED BY ANTS

Garbage Disposal Leak Thwarted By Ants

 

 
Over the weekend, to my mother-in-law’s displeasure, were hundreds of ants walking along her ceiling, around her family room, and into her remodeled kitchen.
She had not remodeled by choice a year and a half ago… but because her ice maker line sprung a pin hole leak that turned into the flood of the century for her. Her cabinets, made out of particle board, immediately swelled up and the cabinets were a total loss.
If it were not for those pesky ants, this could have been an instant replay two years later.
While searching for ant killer (sorry ants) in the cabinet under the sink, she reached in only to find every package was wet… but the ant killer was NOT leaking. Lucky for her, the ant killer was in a bucket, so the water did not damage the cabinets.

WHERE WAS THE WATER COMING FROM?

Under-sink leaks can do a lot of damage.  The water can be coming from the drainpipes, the supply hoses, the garbage disposal or even the faucet itself. The source is usually apparent as soon as you crawl under the sink with a flashlight.

In my mother-in-law’s case, it was her garbage disposal.

DISPOSAL COULD HAVE MULTIPLE LEAK LOCATIONS

While the water draining from your disposal may look like it’s coming out right from the bottom, sometimes that’s not the case.

The leak could be coming from one of 5 common areas, as pictured here:

Garbage Disposal in a Lake Havasu City home

  1. The sink flange — where the sink and the disposal unit directly connect
  2. The dishwasher hose — where the hose and the disposal connect
  3. The drain — where the drainage pipe and the disposal connect
  4. The bottom — water actually draining from the very bottom of the disposal
  5. The sides – if the disposal has rusted or corroded

FINDING THE SOURCE OF THE LEAK

  1. Unplug your garbage disposal. If the area around the electrical socket is in any way damp, turn off the breaker for that section of the house beforehand. Don’t risk getting shocked.
  2. Remove everything from under the sink and place a bucket, deep-bottom pan, or small trash can underneath the disposal to catch any water that may come out. No sense cleaning up twice.
  3. Get the plug for your sink and place it in the drain.
  4. Fill the sink with water until it’s a little less than halfway full (not even close to a majority of this will be coming out of the leak, don’t worry). Then, place a few drops of food coloring in the water. The color doesn’t matter, just so long as it makes the water stand out against the black of your disposal unit.
  5. Observe if there are any leaks coming from under the sink. If there are, you’ve found the problem: the sink flange.
  6. If there are no visible leaks, remove the plug from the sink and use a flashlight to observe where the water is coming from (checking the 4 places in the image above).

PROBLEMS AND FIXES

1 THE SINK FLANGE 

Likely problem: If the leak is visible before you unplug the drain, it usually means the seal between the sink and disposal has broken.

Fix: You need to detach the disposal from the sink, remove the plumber’s putty and then reseal the flange.

2 & 3 THE DISHWASHER HOSE

Likely problem: The seal between the disposal and one of these lines is likely broken.

Fix: You’ll need to replace the seal. This will vary depending on the disposal unit you have and the plumbing in your home.

 

4 DISPOSAL BOTTOM

Likely problem: Broken seals inside of the garbage disposal itself.

Fix: You can replace the seals inside of the disposal. However, if one is broken now, it won’t be long before another wears out and needs to be replaced. So it’s usually more economical and easier to replace the garbage disposal.

5 CORRODED DISPOSAL

 Fix: You’ll need to replace the disposal
DO NOT ATTEMPT REPAIRS YOURSELF IF YOU ARE UNSURE WHAT TO DO!  CALL A LICENSED PLUMBER!!!

PREVENTING A FLOOD

If you can, place the items under your sink in a bucket or water proof container

My mother-in-law averted a disaster because her items were organized in a water proof container. Yes, it had water in it, but the water never touched her cabinets.

Periodically check for leaks.

Every month (or week) check under you sink to make sure there are no leaks. This is as simple as looking with a flashlight, running your hands under the cabinet, or checking the bucket (see the above suggestion) to ensure there is no water in it.

If you are not as lucky as my mother-in-law was and have a flood:

  1.  Turn off your water
  2.  Contact your insurance company and call a water extraction service
  3.  If need be, contact a public adjuster

and then, when you are ready to have your house put back together and want a professional remodeling experience, contact your local design-build contractor, Leading Edge Homes. Inc. Want to see some of our work? Visit our website or view our online book.

For all of your home remodeling and inspection needs, contact your local certified “roomologist”, Leading Edge Homes. Inc. at 561-795-2551.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Home Improvement: KITCHEN REMODELING WHEN YOU HAVE FURRY FRIENDS

Remodeling Your Kitchen With Your Dog In Mind

Leading Edge Homes, Inc. dog and human approved!

Leading Edge Homes, Inc. dog and human approved!

Leading Edge Homes, Inc. is dog and owner approved and your dog will love these changes when you are remodeling your kitchen.

There are so many things you can do to make hidden nooks and crannies for your dog and keep your kitchen safe from trip hazards. It’s a win-win for you and your furry friend.

SAFETY FOR YOU AND YOUR PET

A SAFE PLACE FOR YOUR DOG TO REST
dog in bed

If you have  “extra” base cabinet space install a dog bed under the counter or in your island. However, don’t build the bed space under a cooking area. Your dog will have a safe place to stay while you are working in the kitchen.

DON’T TRIP OVER YOUR DOG’S BOWLS

How many times have you tripped over your dog’s bowls?

pull out food

Hiding the food bowls in your cabinets.

Ask your remodeler to build a custom drawer, where the toe-kick is, that you can pull out when it is feeding time.

Although this is a unique idea there are downsides. You will need to pull the drawer out frequently so your dog can get water throughout the day and your dog may try to pull open the drawer and paw at the cabinet to get to his food.

food under cabinet

Another way to avoid a trip hazard!

Or, build a special feeding area under a cabinet or island.  That way the bowls are safely out of the way and your dog will have access to water as needed.

PULL OUT CABINETS FOR YOUR DOG KIBBLE!

Wooden Kitchen Cabinets with Trash Cans inside

Normally, people use this type of cabinet for holding garbage cans. Why not install a pull out cabinet for your dog food?

Now you won’t have to walk to the garage or storage cupboard for a cup of kibble.

I would strongly recommend that you use a container that is air-tight and has a lid so ants and other creatures don’t try to get a free meal!

TILE COLOR MATTERS

Want to hide your dog hair? Choosing the right color tile, depending on the color of your dog, makes a difference!

Kitchen remodeling tile color

I bet you can’t find my hairs on the tile!

Tiles that are in the grey or tan family hide a multitude of sins!  We have a brindle Jack-Russell / Boston Terrier mix, Tedy, and a regular visiting mixed breed dog that we affectionately named Blizzard. As you can imagine, Blizzard sheds white hair everywhere and Tedy is not far behind him.

The tile always looks clean (unless of course you are looking from an angle and can see the dogs hairs).

Renovating your kitchen with your dog in mind can help bring many great conveniences to your home.

For more ideas about how you can customize your house for your needs contact Leading Edge Homes, Inc. at 561-795-2551.

 


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Ideas: Proper Planning Reduces Stress When Remodeling Your Kitchen

You can have a brand new kitchen just like mama’s!

I recently performed a total replacement of my mother-in-law’s kitchen.  Here’s some helpful advice I gave her that you will find eases the stress when you are ready to remodel your kitchen.

Set up a separate, temporary kitchen.

If at all possible, move your current refrigerator to another room in the house, where you can still access it.. A spare microwave is also a critical appliance.Be creative with small plug-in appliances that can make life easier during construction, such as a coffee maker or electric skillet.

Find a place in your home to eat.

Most times setting up a card table in the family room does the trick, or go formal and use your dining room.

Invest in paper plates and disposable utensils.

You will end up having to wash dishes in a bathroom sink, so it’s best to keep a stockpile of disposable plates and utensil handy.

Think about your pets.

If your pets are used to having the run of the house, consider how they will be affected when sections of the house are off-limits to them. Above all, ensure their safety.

Get a sketch or design plans beforehand. 

Think about how the kitchen is going to work from a functional level. It’s also wise to think about where all your current kitchen items and appliances will fit into the new kitchen.

Don’t sweat the small stuff. 

Don’t agonize over the smallest details like hardware and countertop edges. Keep a sense of perspective and don’t get hyperfocused and paralyzed by decisions on the smallest details, which cause delays. The point is for all of it to come together beautifully.

 

When you are ready to be the proud owner of your dream kitchen, know that Leading Edge Homes will be there to help you from start to finish so you can have a gorgeous kitchen just like “Mama’s”.

If you have specific questions about kitchen design, kitchen remodeling, or any other home improvement project, please call me at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.
Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Idea: Luxury Trends

 

Three of the Latest “Must Have” Kitchen Upgrades

Whether you want to spruce up the kitchen you have or are planning a full kitchen makeover, consider these latest luxury trends:

POT FILLER
  
Why hurt your back filling a large pot over the sink and carrying it to the stove or cooktop when you can install a faucet directly over where the water will be boiled.
SUPER-QUIET DISHWASHER
.
Bosch high end dishwashers are so quiet you may not even notice that they are running.  They have a half-load option, are Energy Star compliant, and some even have a built-in water softener and height adjustable upper shelf for convenience.  They are so cool you might even look forward to cleaning up after dinner!
INDUCTION COOKTOPS
 
I can hear the gas cooktop fans now… But 9 out of 10 professional cooks use gas and the 10th one is a sushi chef!  These new induction cooktops have precise temperature control and heat up more quickly than gas or electric.  They typically also have a bridge function to combine two cooking zones for use with wide cookware like griddles.
If you have specific questions about kitchen design, kitchen remodeling, or any other home improvement project, please call me at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.
Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Ideas: Bermuda Triangle or Perfect Triangle?

Making Your Kitchen Easier to Work In

The kitchen is the most used room in the house.  At parties, guests seem almost magnetically drawn to the kitchen.  That’s where the food and drinks are, so this makes sense.  But when you’re cooking before they arrive, is your work triangle like the Bermuda Triangle?

Leading Edge Homes Inc. - Kitchen with Work Triangle

The work triangle refers to the triangle created between your stove, refrigerator, and the sink.  These three “areas” are some of the most important components.  If you have a small kitchen – and as a result, a small work triangle – you almost don’t have enough space to maneuver.  On the other hand, if your work triangle is too big, you not only run yourself to death, but you also have to carry heavy dishes long distances.

Work Triangle Basics

Long ago, when designers started paying attention to how kitchens function day-to-day, they realized there was a natural triangle of traffic for whomever was doing the cooking.  Through years of research they discovered some figures and principles of sound kitchen design.

  • No one side of the triangle should be greater than nine feet or less than four feet.  If you slightly exceed or don’t meet these measurements, this doesn’t mean that your kitchen is dysfunctional.  However, you should measure the distance to each triangle component to see exactly how your kitchen measures up.  If you notice that you feel cramped on one side or can barely make it to the sink with a pot of boiling water on the other, then you might benefit from a kitchen remodel.

 

  • The triangle should not be interrupted by traffic or cabinetry.  If your work triangle dimensions are correct, but they don’t include walking around the island to get to the stove, or that people are always moving to the trashcan or standing by the refrigerator, then maybe kitchen traffic needs to be detoured.

 

  • The perimeter of the triangle should measure no more than 26 feet and no less than 12 feet.  If you have a small kitchen and each component is four feet away from the other, there’s not much you can do.  But consider how easy it is to work in your kitchen.  If something always feels a bit off when you are preparing a big meal, interior designers can help to restructure your kitchen.

If your kitchen doesn’t measure up and is not working for you, call Leading Edge Homes at 561-795-2551 so we can collaborate with you to create your dream kitchen that functions properly.

Questions?

If you have specific questions about kitchen design, kitchen remodeling, or any other home improvement project, please call me at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.
Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Ideas: Home Improvement Lighting Options

Kitchen Lighting Options

Kitchen lighting options have come a long way since the days of one surface-mounted fixture in the center of the room.  The ‘70s and ‘80s trend of cove lighting was an improvement but still far from optimal.

Palm Beach County Popular Home Improvement Lighting Ideas

Today there are many choices a kitchen remodeling contractor might suggest, but the following are the most popular in Palm Beach County:

Leading Edge Homes-Inc. Kitchen Remodel Lighting

Kitchen Idea: Add pendant lighting to dress-up your kitchen and provide better lighting above an island.

 

  • Recessed spot lights – usually four spread evenly around the kitchen and one over the sink
  • Pendant lights – usually three over an island or peninsula
  • Under cabinet – can be florescent or xenon type but LED is used most
  • Above wall cabinet – again usually LED and illuminates the rest of the wall and part of ceiling

Don’t Forget

Regardless of which type of lights you select, make sure you will have plenty of general light and task light.  Also remember that the higher the ceiling, the less light that makes it down to countertop level so adjust the quantity, type, and bulbs used accordingly.

Questions?

If you have specific questions or need a home inspection, please call me at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.
Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.