Are You Done Yet – Understanding the Remodeling Process

“ARE YOU DONE YET?” – UNDERSTANDING THE REMODELING PROCESS

No, home remodeling is not like what you see on television - it takes time.

No, home remodeling is not like what you see on television – it takes time.

 

HOW LONG WILL IT TAKE?

As a contractor, my two least favorite questions are “How long will it take?” and “Are You Done Yet?”  Perhaps it is because it reminds me of the long trips in the car when my children were young and they asked the infamous question “Are we there yet?”

To answer the question “how long will it take,” there is no clear cut answer. No two jobs are alike. Construction phases take varying amounts of time.

The outline below is a general guideline of what to expect during a home remodeling experience.  One thing to remember is that you may not see someone at your site daily when you do a home remodeling project.  Scheduling, weather, inspections, and material availability all play a part in how long your project takes to complete.

HOME REMODELING PROCESS / STEPS

If you read through all of the following steps, you will see that there are many moving parts that must be coordinated to complete a project. Leading Edge Homes, Inc. tries to ensure that your home improvement project moves along as quickly as possible, but will never sacrifice quality for speed.  

Please note, not all of the following steps are required for each type of job. Each step is prefaced with an “A” for an Addition and  “R” for a Remodeling / Renovation project.

APRELIMINARY SOIL TESTS / SURVEYS

ARREROUTING WIRES OR PLUMBING

Rerouting of overhead electric, cable TV,  and phone service, and sewer and water supply lines if necessary.

ARDEMOLITION

Any existing structures (roof overhangs, screen rooms, existing concrete, etc.) in the way of the addition are removed.  Land is cleared by machinery if site conditions allow, otherwise it is cleared by hand.

For an interior remodel, the cabinets, walls, floor coverings, and fixtures in the work area are removed.  This creates lots of dust.  Make sure any objects that could not be removed are protected.

Debris is placed in a designated area or in the provided trash receptacle.  Leading Edge Homes, tries to clean up the site daily, however, at times piles of debris are visible.

AEXCAVATION AND SETTING FORMS

The addition area plus at least 3 feet beyond are cleared down to suitable soil.

Fill dirt is delivered to the addition area and compacted.  Please do not remove any of this dirt.  It is needed to create the house pad.

Footers are dug around the addition perimeter and forms are placed into the dirt.

These forms are set in place with precision instruments, and a survey will be taken with them in place.  Do not move or alter them in any way.  Should you accidentally step on or disturb one of these forms, please contact the office immediately so the forms can be rechecked for accuracy before the concrete pour.

A soil density test is conducted.

A form board survey is performed.

AUNDERGROUND UTILITIES

The underground plumbing, electric, and air conditioning pipes are placed in what becomes the slab.  Do not remove or change the position of any of these items.  They have been placed in the precise location in which they are needed.

Separate inspections for each of these trades is performed.  Inspections may not occur on the same day.  All trades must pass inspection before work can proceed.

APOISON THE SOIL

This is the first of two sprayings to prevent termites.  Do not touch the soil!  It is hazardous to your health.

ASLAB FORMATION COMPLETION

Plastic, steel (it may be rusted, but that does not effect the strength of the slab), and recess forms are put into place.

Another inspection is performed.

APOUR THE CONCRETE

Once the pad is formed and passes all inspections, the slab will be poured.  This is a difficult date to schedule.  It is subject to weather conditions (on the date of the pour and on prior days), equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.  We are as anxious as you to complete this phase. If you can’t resist, please wait at least 24 hours after the concrete finishers have left before walking on the new concrete.

Some concrete may squeeze out from under or around the forms.  This is a normal condition.

Loads of concrete may vary in color.  This is a normal condition and does not affect performance.

Cracking may occur during the first 90 days of curing, and later during the first year.  Steel reinforcement has been installed in the slab to reduce the separation of the concrete when it cracks.  (The concrete will be specially prepared if tile is to be installed on it.)

Sudden inclement weather conditions may require protecting wet concrete with a temporary plastic covering.  This may result in an alteration of the finished appearance of the concrete surface.  Do not be concerned.  This does not affect the concrete’s performance.

ABUILD EXTERIOR WALLS AND ROOF

Wood / Steel Framed Construction

The exterior walls are framed with wood and / or steel.

The roof trusses are set, sheathing is attached to the trusses and exterior walls, and the fascia is installed.

It is time for another inspection.

Block / Masonry Construction

The exterior walls are built with masonry block.

The column and beam steel is installed.

The tie beam is formed, where and if needed.

It is time for another inspection.

Wood scraps are fastened over any column clean out holes.

Concrete is poured into the tie beam and columns.

Note: This concrete is a special mix and appears to be watery! Do not be concerned. Its formulation causes it to be extremely strong when dry.

The roof trusses are set, sheathing is attached to the trusses, and fascia is installed.

It is time for another inspection.

AROOF COVERING

The roof is dried in.  Roofing underlayment is attached to the sheathing, and metal drip edge, valley, and “L” flashing is installed.

Skylights (if any) are installed.

It is time for another inspection.

If the final roof covering is tile, more roofing underlayment may be installed, and the tile is loaded on the roof.  Otherwise, the final roofing material is installed on the roof.

A R INTERIOR FRAMING

The window bucks and windows are installed.

The exterior door bucks and doors are installed.

Interior walls are framed and block walls are firred as necessary.

You can now see your room(s).  They may appear smaller than you expected, but will look larger once the drywall is installed.

The rough air conditioning (duct work), plumbing (including tubs), and electric are installed.

It is time for more inspections.

APREPARING THE HOUSE EXTERIOR

Wire lath is installed over exterior sheathing, and in the soffits.

Scaffolding may be present on your job site.  DO NOT allow children to play on it.

Hurricane tracks are installed (if they are embedded in the stucco).

It is time for another inspection.

The exterior is painted, then roof tile, if applicable, is installed.

A R  —   INSULATION

Insulation is installed in the walls and ceilings.

It is time for another inspection.

 

A R     DRYWALL

Drywall is fastened to walls and ceilings.

In most municipalities, it is time for another inspection.

The walls and ceilings are finished.  This multi-step process is effected by humidity, and requires varying amounts of drying time.

Wall and ceilings are spray textured, if applicable.

 

A RINTERIOR FINISHING TOUCHES

Interior doors are hung, and pull down stairways are installed.

Cabinets are installed.

Interior base and case moldings are installed.

Tile is installed on floors and walls, if and where applicable.

The interior is painted.

Shelving, mirrors, countertops, and tub skirts are installed.

The air conditioning equipment and grills are installed.

The final plumbing fixtures and faucets are installed.

The electric switches, outlets and fixtures are installed.

It is time for inspection of all the trades.

 

A EXTERIOR FINISHING

Hurricane hardware is installed.

The flatwork (sidewalks, patio areas, etc.) is formed.  Soil in areas  under roof are sprayed to prevent termites.  Do not touch the soil!  It is hazardous to your health.

Reinforcing steel may, or may not, be placed in the flatwork area.

The flat work is inspected.

The concrete is poured.  This is a difficult date to schedule, due to weather conditions (on the date of the pour and prior days),  equipment availability, and the concrete finishing crew’s schedule.

Your patience is appreciated.

You may walk on the new concrete 24 hours after the pour.  Do not drive on a new concrete driveway for at least one week.

Loads of concrete may vary in color, and will NOT be the same color as existing sidewalk, driveway, or patio areas.  There is no way to control the color variations of concrete.

The final vertical spray for termites is performed.

Any sod replacement and sprinkler repair specified is performed.

A RTHE PROJECT IS ALMOST DONE

Screens are installed in any windows.  The dumpster and portable toilet will be removed from your site.

 

The FINAL BUILDING INSPECTION is performed.

 

The carpeting is installed. This is done after the final inspection because we want no one to walk on your new carpet but you!

A RENJOY YOUR FINISHED PROJECT

Leading Edge Homes thanks you for your patience and hopes you enjoy the changes to your home.

 

If you are considering a home remodeling project or have been inspired by something you have seen on television and want to determine if it can be duplicated in your home, contact Leading Edge Homes, Inc. at 561-795-2551.  We will give you a real, guaranteed price and our best guestimate of how long the project will take.


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

Home Improvement: KITCHEN REMODELING WHEN YOU HAVE FURRY FRIENDS

Remodeling Your Kitchen With Your Dog In Mind

Leading Edge Homes, Inc. dog and human approved!

Leading Edge Homes, Inc. dog and human approved!

Leading Edge Homes, Inc. is dog and owner approved and your dog will love these changes when you are remodeling your kitchen.

There are so many things you can do to make hidden nooks and crannies for your dog and keep your kitchen safe from trip hazards. It’s a win-win for you and your furry friend.

SAFETY FOR YOU AND YOUR PET

A SAFE PLACE FOR YOUR DOG TO REST
dog in bed

If you have  “extra” base cabinet space install a dog bed under the counter or in your island. However, don’t build the bed space under a cooking area. Your dog will have a safe place to stay while you are working in the kitchen.

DON’T TRIP OVER YOUR DOG’S BOWLS

How many times have you tripped over your dog’s bowls?

pull out food

Hiding the food bowls in your cabinets.

Ask your remodeler to build a custom drawer, where the toe-kick is, that you can pull out when it is feeding time.

Although this is a unique idea there are downsides. You will need to pull the drawer out frequently so your dog can get water throughout the day and your dog may try to pull open the drawer and paw at the cabinet to get to his food.

food under cabinet

Another way to avoid a trip hazard!

Or, build a special feeding area under a cabinet or island.  That way the bowls are safely out of the way and your dog will have access to water as needed.

PULL OUT CABINETS FOR YOUR DOG KIBBLE!

Wooden Kitchen Cabinets with Trash Cans inside

Normally, people use this type of cabinet for holding garbage cans. Why not install a pull out cabinet for your dog food?

Now you won’t have to walk to the garage or storage cupboard for a cup of kibble.

I would strongly recommend that you use a container that is air-tight and has a lid so ants and other creatures don’t try to get a free meal!

TILE COLOR MATTERS

Want to hide your dog hair? Choosing the right color tile, depending on the color of your dog, makes a difference!

Kitchen remodeling tile color

I bet you can’t find my hairs on the tile!

Tiles that are in the grey or tan family hide a multitude of sins!  We have a brindle Jack-Russell / Boston Terrier mix, Tedy, and a regular visiting mixed breed dog that we affectionately named Blizzard. As you can imagine, Blizzard sheds white hair everywhere and Tedy is not far behind him.

The tile always looks clean (unless of course you are looking from an angle and can see the dogs hairs).

Renovating your kitchen with your dog in mind can help bring many great conveniences to your home.

For more ideas about how you can customize your house for your needs contact Leading Edge Homes, Inc. at 561-795-2551.

 


Todd Perry, a State of Florida Certified Building Contractor and president of Leading Edge Homes, Inc., provided this information.

If you have questions about a home improvement project, call Leading Edge Homes at 561-795-2551 or email Todd at: todd@leadingedgehomes.com and he’ll be happy to share his knowledge with you.

Leading Edge Homes, Inc. specializes in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust.
Visit the Leading Edge Home’s website or call 561-795-2551 to discover how they can help you with your next home remodeling project in Palm Beach County.

HOME IMPROVEMENT: What to Expect When Remodeling

Ten Things to Expect When Remodeling

Leading Edge Homes - Remodeling Dreams

Home improvement projects don’t happen overnight like they do on television. Know what to expect before you begin the process.

Dust.

Even when temporary plastic sheeting walls are erected, a fine layer of dust and dirt will still get passed it. Remember to change the air filters on your HVAC system often.

Noise.

There is no way to get around it – from circular saws to air guns and compressors, construction is noisy. Plan to take a daytime nap somewhere else or invest in a good set of ear muffs if the noise will bother you.

Soaring highs.

It may be the demolition of those ugly kitchen cabinets you’ve hated for years or the installation of drywall signaling a milestone toward completion. Celebrate them.
A few sighs. You may become tired of making so many decisions or writing large checks. Don’t be discouraged, it will be worth it when the project is complete.

 

The unexpected.

Lead based paint, crooked existing walls, or a cracked tie beam. No, you won’t be laughing but neither will the contractor.

Change orders.

You may want to upgrade materials or add to the scope of work. Yes it will cost more and the project may take longer, but you will be enjoying the new or remodeled area for years to come.

Cash concerns.

You may start getting upset over the amount of money you are spending, especially if you have made many change orders. A good rule of thumb is to set aside a minimum of 10% of the project cost for extras. Doing so will help alleviate some of the stress.

Delays.

Rain storms, sub-contractors not showing up, materials on back order – the list is endless. Construction is far from a perfect world. You need to be resilient.

Decisions.

Where do you want the switches, how high should the fixture be hung, oil-rubbed bronze or chrome? Count on lots of questions. Your selection of a contractor is just the first of many decisions you will have to make.

A party.

When everything is complete, you are going to want to show off your project. It’s fun for both you and your guests to see a beautifully finished home.

 

If you have questions about any home improvement project please call Leading Edge Homes at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.

Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.

Kitchen Ideas: Home Improvement Lighting Options

Kitchen Lighting Options

Kitchen lighting options have come a long way since the days of one surface-mounted fixture in the center of the room.  The ‘70s and ‘80s trend of cove lighting was an improvement but still far from optimal.

Palm Beach County Popular Home Improvement Lighting Ideas

Today there are many choices a kitchen remodeling contractor might suggest, but the following are the most popular in Palm Beach County:

Leading Edge Homes-Inc. Kitchen Remodel Lighting

Kitchen Idea: Add pendant lighting to dress-up your kitchen and provide better lighting above an island.

 

  • Recessed spot lights – usually four spread evenly around the kitchen and one over the sink
  • Pendant lights – usually three over an island or peninsula
  • Under cabinet – can be florescent or xenon type but LED is used most
  • Above wall cabinet – again usually LED and illuminates the rest of the wall and part of ceiling

Don’t Forget

Regardless of which type of lights you select, make sure you will have plenty of general light and task light.  Also remember that the higher the ceiling, the less light that makes it down to countertop level so adjust the quantity, type, and bulbs used accordingly.

Questions?

If you have specific questions or need a home inspection, please call me at 561-795-2551 or email me at: todd@leadingedgehomes.com and I’ll be happy to share my knowledge with you.
Leading Edge Homes, Inc. is a Florida certified building contractor specializing in improving your lifestyle through room additions, bathroom renovations, kitchen updates, hurricane-resistant screen enclosures, and more!  In business since 1991, they demolish your stress by building your trust. Contact them at 561-795-2551 or visit their website to discover how they can help you with your next home remodeling project in Palm Beach County.